NEW! Subscribe with your Eircode:

Get notifications:

or subscribe by Eircode:

Weekly planning application updates from Tipperary County Council, 30/10/2019

The following is a list of new and decided planning applications from the past week by Tipperary County Council. Tap on a point on the map to learn more about any application or scroll down to find applicant and development description information.



  • Applicant: J.P. and Pamela Wynne
  • Development Address: Anne Street
  • Development Description: a) removal and replacement of second floor windows to front elevation and all windows to rear elevation, b) internal alterations to existing building including part demolition of internal walls and construction of new walls, provision of new door opes an
  • Status: Conditional
  • Application Received: 22/07/2019
  • Decision Date: 20/10/2019
  • Further Details: http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/19600818/0
  • Applicant: Dominic Foran
  • Development Address: Suirside, Liberty Sq.,, Thurles
  • Development Description: extension and renovation of existing dwelling house with solar panels on the roof of dwelling house which is connected to mains services and all associated works
  • Status:
  • Application Received: 23/10/2019
  • Decision Date: 17/12/2019
  • Further Details: http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/19601177/0
  • Applicant: Paul & Aleksandra O'Connor
  • Development Address: Willow Cliff, Ballina
  • Development Description: the construction of a new entrance porch under the existing balcony, enclosing the first floor balcony to form a study, removal of the existing fireplace and chimney to install a new patio door, removal of the kitchen door to install a new window all to
  • Status: Conditional
  • Application Received: 28/08/2019
  • Decision Date: 22/10/2019
  • Further Details: http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/19600949/0
  • Applicant: John Clancy
  • Development Address: Sarsfield Street, Thurles
  • Development Description: construction of 4 in total, 3 bedroom, 2 storey terraced dwellinghouses with entrances onto to Slieve Na Mban Meadows (Slievenamon Meadows), & Pedestrian entrances onto Davis Road, Demolition of boundary wall, new public footpath, street light, boundary
  • Status: Conditional
  • Application Received: 29/08/2019
  • Decision Date: 23/10/2019
  • Further Details: http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/19600957/0
  • Applicant: Willie John Lonergan
  • Development Address: Ballyneety, Ardfinnan
  • Development Description: erection of a dry store and also provision of concrete hardstanding adjoining the proposed dry store and all associated site works
  • Status: Conditional
  • Application Received: 27/08/2019
  • Decision Date: 21/10/2019
  • Further Details: http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/19600944/0
  • Applicant: Niall Madden
  • Development Address: Ballyhogan, Carrigatoher, Nenagh
  • Development Description: dwelling house, septic tank, percolation area and new entrance and garage and associated site works
  • Status: Conditional
  • Application Received: 01/05/2019
  • Decision Date: 27/10/2019
  • Further Details: http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/19600452/0
  • Applicant: Karl and Jacqueline McNulty
  • Development Address: Castlecranna, Carrigatoher, Nenagh
  • Development Description: renovation of the existing dwelling including new windows and front door and new slated roof finish, single storey extensions at the side to the north and rear to the west of the existing dwelling and all site auxillary works, construction of a new entra
  • Status:
  • Application Received: 23/10/2019
  • Decision Date: 17/12/2019
  • Further Details: http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/19601178/0
  • Applicant: William Ryan
  • Development Address: Kilcolman, Nenagh
  • Development Description: part two storey, part single storey split level dwelling house, onsite waste water treatment system, site entrance and boundary treatment, together with associated site works
  • Status:
  • Application Received: 23/10/2019
  • Decision Date: 17/12/2019
  • Further Details: http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/19601179/0
  • Applicant: Miriam Lee
  • Development Address: Oakhampton, Newport
  • Development Description: two storey house complete with domestic garage, effluent treatment system and a new site entrance
  • Status:
  • Application Received: 24/10/2019
  • Decision Date: 18/12/2019
  • Further Details: http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/19601186/0
  • Applicant: Brendan Keogh
  • Development Address: Stonepark, Ballinderry, Nenagh
  • Development Description: a single storey extension of 36 m2 to the existing garage to be used as a studio
  • Status: Conditional
  • Application Received: 30/08/2019
  • Decision Date: 24/10/2019
  • Further Details: http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/19600963/0
  • Applicant: John Mortimer
  • Development Address: Bawnmadrum
  • Development Description: to upgrade existing entrance, to construct 2 storey extension to rear of existing dwelling and install new septic tank with percolation area, together with all associated site works
  • Status: Conditional
  • Application Received: 27/06/2019
  • Decision Date: 20/10/2019
  • Further Details: http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/19600712/0
  • Applicant: Coillte
  • Development Address: Coumbeg, Portroe, Nenagh
  • Development Description: the construction of new entrance from public roadway onto forestry lands, to comprise the provision of splayed access, clear visibility sightlines, associated setting back of adjacent roadside boundaries, provision of associated surface water drainage, f
  • Status: Conditional
  • Application Received: 28/08/2019
  • Decision Date: 22/10/2019
  • Further Details: http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/19600951/0
  • Applicant: Enda & Carmel O'Connor
  • Development Address: Ballymalone More, Killaloe
  • Development Description: alterations to dwelling (from previously granted planning reference 17601181) to include single storey domestic extension and omission of first floor bedroom extension
  • Status: Conditional
  • Application Received: 30/08/2019
  • Decision Date: 24/10/2019
  • Further Details: http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/19600964/0
  • Applicant: James and Niamh Ryan
  • Development Address: Ballinree, Cashel
  • Development Description: construction and extension to the south side of dwelling and minor elevational changes to the existing house and construction of a garage to the northern side of the site with all associated site works
  • Status:
  • Application Received: 24/10/2019
  • Decision Date: 18/12/2019
  • Further Details: http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/19601185/0
  • Applicant: Valerie Purcell
  • Development Address: Cooleeney
  • Development Description: 1. a domestic extension to the dwelling, 2. a domestic storage shed, 3. roadside boundary treatment, 4. hard standing areas, and all associated site works
  • Status: Conditional
  • Application Received: 02/09/2019
  • Decision Date: 27/10/2019
  • Further Details: http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/19600968/0
  • Applicant: Sean Doheny
  • Development Address: Ballycapple, Cloughjordan
  • Development Description: the construction of a two storey dwelling house, detached domestic garage, waste water treatment system, site entrance and all ancillary site works
  • Status: Conditional
  • Application Received: 31/05/2019
  • Decision Date: 20/10/2019
  • Further Details: http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/19600589/0
  • Applicant: Reps. of Kathleen Flynn
  • Development Address: Lisduff, Thurles
  • Development Description: (1) extension to rear of dwelling house, (2) a porch to the side of dwelling house (3) entrance gates and boundary walls, (4) a domestic garage and all associated works. Planning permission to upgrade the existing septic tank, to a new septic tank and p
  • Status:
  • Application Received: 23/10/2019
  • Decision Date: 17/12/2019
  • Further Details: http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/19601176/0
  • Applicant: Maura Ryan & Sean Berry
  • Development Address: Clonraskin, Birr
  • Development Description: construction of a pitched roof over the single storey portion to the rear & side of the dwelling instead of original parapet flat roof, all with associated site works. This is a variation to the original planning permission number 18600760
  • Status: Conditional
  • Application Received: 28/08/2019
  • Decision Date: 22/10/2019
  • Further Details: http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/19600948/0
  • Applicant: Trevor Cleary
  • Development Address: Carrownaclough North Newtown
  • Development Description: construction of a dwelling house, garage, waste water treatment system, entrance, driveway along with all ancillary site works
  • Status: Conditional
  • Application Received: 30/08/2019
  • Decision Date: 24/10/2019
  • Further Details: http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/19600966/0
  • Applicant: Thomas Cody
  • Development Address: Garryduff
  • Development Description: construction of a new one and a half storey, part single-storey dwelling with detached garage, vehicular entrance, packaged wastewater treatment system and polishing filter (percolation area) and associated site boundary and site development works
  • Status: Conditional
  • Application Received: 28/08/2019
  • Decision Date: 22/10/2019
  • Further Details: http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/19600954/0
  • Applicant: Kevin Dooley & Aoife O'Connell
  • Development Address: Urra, Ballycommon, Nenagh
  • Development Description: two number extensions at ground floor to provide new entrance at rear and enlargement of ancillary entrance at side together with first floor extension for additional bedroom accommodation (one number), minor alterations to elevations and ancillary relat
  • Status: Conditional
  • Application Received: 12/04/2019
  • Decision Date: 21/10/2019
  • Further Details: http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/19600375/0
  • Applicant: Sally & Robert Morris
  • Development Address: Fee Beg, Borrisokane
  • Development Description: the construction of a single storey extension of existing bathroom to the south eastern side of our existing dwelling and all ancillary site works thereto
  • Status: Conditional
  • Application Received: 28/08/2019
  • Decision Date: 22/10/2019
  • Further Details: http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/19600955/0
  • Applicant: Hally & Sons Ltd
  • Development Address: Gort Na Manach
  • Development Description: completion of infrastructural work commenced under previous Permissions Nos. 05/43 and 07/107 and to construct 22 no. two-storey houses complete with external works and site development works, on their site. The development will include 10 no. detached
  • Status: Conditional
  • Application Received: 07/02/2019
  • Decision Date: 20/10/2019
  • Further Details: http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/19600097/0

Account






Subscribe by Eircode: